Click on the thumbnails to view larger version or left/right arrows
for more
Trillian at the boat yard almost ready to be moved to the launch site.
Last minute finishing work on the bottom of the pod. The transom had to be modified for the deeper mounting of the "Power Tilt" outboard. A 100L fuel tank is built into the pod.
Using 1 1/2" white polyester webbing we made up a trampoline. A bow roller was also made up on the front beam. Speaker boxes were added at the front of the pod.
Beach catamaran type polyester mesh was used for seats.
The engine mounted with remote. Note the compass mount and fuel hose connection for the built in tank
The mast raising just before the boat was launched. A couple of mainsheets were used.
A series of heavy duty rollers was used to move Trillian into the
water. A thick hardwood plank protected the keel. Neil Sandidge's T21 in the background.
(see Scott's brokerage, it's for sale)
The moment of truth as Trillian is almost afloat.
The proud team that built Trillian including myself and Andy Smith on the right.
.
Trillian at the boat yard almost ready to be moved to the launch site.